28 September 2016
Port Sudan, Alkhair oil terminal
Sunagas and it's PMC Kicked-off with SPC to Carry on the Surveys work at the Onshore site of the LNG Terminal – finalize the necessary coordination and site permissions for the surveys’ operation ,Handover the Onshore site of the LNG Terminal to the CONTRACTOR of the Onshore Surveys (ESD) Check – Physically – boundaries for the area provided by SPC Obtain the necessary Benchmarks – from SPC – to proceed with Surveys Work and Discussed – on site – the relevant specific technical issues (boundaries in reclaimed area – flare location)