10 February 2018
Port Sudan, Alkhair oil terminal
Sunagas and it's PMC delegates visited the site to determine the technical feasibility of Floating solution berth and construction of the infrastructure on Damma Damma site, obtain the required information, Pipeline route Survey and meeting with Port sudan power station site manger to agree on the feasibility of making heat integration solution between two parties